OP248, E-Redes Operation as part of EDP Operation of Cutting Electricity & Gas:

On 26 September 2023, E-Redes Intentionally cut the electricity of Dr. Rozen-Bakher from the National Portuguese Electricity Infrastructure in trying to help EDP to obstruct justice - Who Instruct E-redes to Cut the Electricity without the Permission of Dr. Rozen-Bakher

https://www.rozen-bakher.com/iccg-announcements/op248

Published Date: Information and Proofs will be uploaded soon

OP248,  E-Redes Operation as part of EDP Operation of Cutting Electricity & Gas:  On 26 September 2023, E-Redes Intentionally cut the electricity of Dr. Rozen-Bakher from the National Portuguese Electricity Infrastructure in trying to help EDP to obstruct justice - Who Instruct E-redes to Cut the Electricity without the Permission of  Dr. Rozen-Bakher ,  https://www.rozen-bakher.com/iccg-announcements/op248, Residence Location,  Portugal,  Main Entity,  E190,  E-redes,  Portugal,  Sub-Entity I,  E191,  Redes Energéticas Nacionais,  Portugal,  Sub-Entity II,  E060,  EDP,  Portugal


Highlights


Dr. Ziva Rozen-Bakher

Dr. Ziva Rozen-Bakher - A Researcher in International Relations with a Focus on Security, Political and Economic Risks for Foreign Direct Investment (FDI) and International Trade

https://www.rozen-bakher.com/
Previous
Previous

OP249, E-redes Operation as part of EDP Operation of Cutting Electricity & Gas:

Next
Next

OP247, Intrum Portugal Operation-EDP Proxy Taking Money: