OP251, T EDP Operation of Cutting Electricity & Gas:

Technicians of EDP lied regarding 3 Different Days (20.09.2023 at 10:30-13:00; 21.09.2023 at 13:00-15:30; 25.09.2023 at 10:30-13:00) that Dr. Rozen-Bakher was not at Home when they were Supposed to Come to take the Meter Reading according to EDP SMSs, while on 26 September 2023, E-redes Intentionally Cut the electricity of Dr. Rozen-Bakher from the National Portuguese Electricity Infrastructure

https://www.rozen-bakher.com/iccg-announcements/op251

Published Date: Information and Proofs will be uploaded soon

OP251,  EDP Operation of Cutting Electricity & Gas: Technicians of EDP lied regarding 3 Different Days (20.09.2023 at 10:30-13:00; 21.09.2023 at 13:00-15:30; 25.09.2023 at 10:30-13:00) that Dr. Rozen-Bakher was not at Home when they were Supposed to Come to take the Meter Reading according to EDP SMSs, while on 26 September 2023, E-redes Intentionally Cut  the electricity of Dr. Rozen-Bakher from the National Portuguese Electricity Infrastructure,  https://www.rozen-bakher.com/iccg-announcements/op251, Residence Location,  Portugal,  Main Entity,  E060,  EDP,  Portugal,  Sub-Entity I,  E193,  Technicians of EDP, 20.09.2023 at 10:30-13:00,  Portugal,  Sub-Entity II,  E194,  Technicians of EDP, 21.09.2023 at 13:00-15:30,  Portugal,  Sub-Entity III,  E195,  Technicians of EDP, 25.09.2023 at 10:30-13:00,  Portugal,  Sub-Entity IV,  E012,  NOS (Internet, Mobile, Fax, Landline, Cable TV), ,  Portugal


Highlights


Dr. Ziva Rozen-Bakher

Dr. Ziva Rozen-Bakher - A Researcher in International Relations with a Focus on Security, Political and Economic Risks for Foreign Direct Investment (FDI) and International Trade

https://www.rozen-bakher.com/
Previous
Previous

OP250, Intense Cyber Attacks as Part of EDP Operation: Slowing Laptops and Blocking Access to Free Internet to Block Uploading Proofs related to EDP Case to Prevent Bringing the Case to Court

Next
Next

OP249, E-redes Operation as part of EDP Operation of Cutting Electricity & Gas: