OP266, Hard Proof for involvement of Local Spy Agents in Portugal in light of the Operation at Coffee Shop in Areeiro Lisbon that NEVER had Internet - Electricity Sockets Operation at a Coffee Shop in Lisbon during the Electricity Cutting by EDP: ICCG Neutralized 4 Electricity Sockets at the Coffee Shop to Prevent from Dr. Rozen-Bakher to Charge and Work with her Laptops when she had no Electricity at Home  - It was done in Two Double Tables where Dr. Rozen-Bakher used to sit, while the Electricity Sockets in Single Tables continue to Work Properly

https://www.rozen-bakher.com/iccg/op266

ICCG Announcement: It will be Uploaded Soon

OP266, Hard Proof for involvement of Local Spy Agents in Portugal in light of the Operation at Coffee Shop in Areeiro Lisbon that NEVER had Internet - Electricity Sockets Operation at a Coffee Shop in Lisbon during the Electricity Cutting by EDP: ICCG Neutralized 4 Electricity Sockets at the Coffee Shop to Prevent from Dr. Rozen-Bakher to Charge and Work with her Laptops when she had no Electricity at Home  - It was done in Two Double Tables where Dr. Rozen-Bakher used to sit, while the Electricity Sockets in Single Tables continue to Work Properly , https://www.rozen-bakher.com/iccg/op266, Residence Location, Portugal,  Main Entity, E209, Coffee Shop in Areeiro Lisbon,  Portugal,  Sub-Entity I,  E192,  Israeli Cover-up Conspiracy Group (ICCG),  Portugal


Highlights