CALL006, Urgent Call to Human Rights Lawyers: Giving Urgent Claim against EDP, E-redes, Gold Energy, ERSE and Intrum:

Intentional Cutting Electricity and Gas, and Intentional Delay in Providing Gas based on New Contract with Gold Energy

https://www.rozen-bakher.com/iccg-announcements/call006

Published Date: 28 September 2023. Latest Update: 14 December 2023


List of ICCG Operations and Complaints related to the Legal Fight against EDP, ERSE, E-redes, Redes, and Intrum

Number of Operation, Title of Operation, Link of Operation, Residence Location, Residence Location of Operation or Latest Residence Location of Ongoing Operation, Either in Permanent Address or as Refugees in Hotels, Main Entity, Number of Main Entity, Name of Main Entity, Country of Main Entity, Sub-Entity I, Number of Sub-Entity I, Name of Sub-Entity I, Country of Sub-Entity I, Sub-Entity II, Number of Sub-Entity II, Name of Sub-Entity II, Country of Sub-Entity II, Sub-Entity III, Number of Sub-Entity III, Name of Sub-Entity III, Country of Sub-Entity III, Sub-Entity IV, Number of Sub-Entity IV, Name of Sub-Entity IV, Country of Sub-Entity IV, Sub-Entity V, Number of Sub-Entity V, Name of Sub-Entity V, Country of Sub-Entity

  • OP093, EDP Operation in Pre-Cutting Electricity & Gas (10/2022-09/2023) that Triggered Complaints to EDP & ERSE (CM033, CMo67, CM016) and Repeated Requests to Pay the Bills before Cutting: i) EDP System Fall Down when the Fixed-Monthly Contract was done in 10/2022, which Prevents the Ability to Check if what was said by the representative of EDP indeed appeared in the contract as the contradiction regarding EDP insurance. ii) Forcing Insurance of FULL EDP instead of EDP Smart as agreed when the Contract made. iii) In 11/2022, EDP sent an SMS that the contract is Cancelled despite that not. iv) EDP Collected the Bill of 11/2022 via Direct Debit that appeared in the Direct Debit Bank Page, while EDP Collected the Bills of 12/2022, 01/2023, 02/2023 via the Bank Account yet these Bills did Not Appear in the Direct Debit Bank Page as all Direct Debit Bills of Other Providers (e.g. NOS), still, in the bank account these Transactions were mentioned as ‘Direct Debit’ - when it was Revealed the Direct Debit was Cancelled. v) EDP Tried to Force Contract Change from Fixed-Monthly Contract (160805767507) to Non-Fixed Monthly Contract (33609390), despite that Dr. Rozen-Bakher NEVER agreed to this Change - EDP tried to 'Take Money' immediately, despite the Right for Social Tarif (Discount for Unemployed) at the End of the Year. vi) EDP and ERSE Ignored Repeated Complaints and Requests, Directly and via the Red Book, to Pay the Bills based on the Fixed-Monthly Contract via MB or Bank Transfer or Credit Card instead of via the Direct Debit that was Cancelled - Despite that, EDP cut the Electricity and Gas on 11.09.2023 at 12:30 without any Formal Notice Letter before the Cutting excluding SMS that was sent on the same Date in the morning with a Demand to Pay Immediately app. of 1,200 Euro based on Force Non-Fixed Contract that Dr. Rozen-Bakher NEVER signed. vii) INTRUM as a Proxy-EDP tried to 'Take Money' of FULL EDP via Repeated Emails and SMSs of Debt Collecting (OP247), despite that NO direct contract ever made with INTRUM including not given Contact Details,  https://www.rozen-bakher.com/iccg-announcements/op093, Residence Location,  Portugal,  Main Entity,  E060,  EDP,  Portugal,  Sub-Entity I,  E012,  NOS (Internet, Mobile, Fax, Landline, Cable TV), ,  Portugal,  Sub-Entity II,  E054,  NETIM (Mailbox),  France,  Sub-Entity III,  E094,  Santander in Portugal,  Portugal,  Sub-Entity IV,  E061,  ERSE Entidade Reguladora dos Serviços Energéticos,  Portugal,  Sub-Entity V,  E177,  INTRUM,  Portugal

  • OP122,  EDP Operation in Pre-Cutting of Electricity & Gas: Obstruction of Justice - Blocking Appeal to ERSE about the Complaint against EDP in Red Book,  https://www.rozen-bakher.com/iccg-announcements/op122, Residence Location,  Portugal,  Main Entity,  E061,  ERSE Entidade Reguladora dos Serviços Energéticos,  Portugal,  Sub-Entity I,  E012,  NOS (Internet, Mobile, Fax, Landline, Cable TV), ,  Portugal,  Sub-Entity II,   ,   ,   ,  Sub-Entity III,   ,   ,   ,  Sub-Entity IV,   ,   ,   ,  Sub-Entity V,   ,   ,   ,  Sub-Entity VI

  • OP245,  EDP and E-redes Operation of Preventing Electricity: E-redes Intentionally did Not Forward the Meter Reading to Gold Energy to Sabotage Getting Electricity following the New Electricity Contract with Gold Energy (NC0194544/2023, 18.09.2023) ,  https://www.rozen-bakher.com/iccg-announcements/op245, Residence Location,  Portugal,  Main Entity,  E060,  EDP,  Portugal,  Sub-Entity I,  E190,  E-redes,  Portugal,  Sub-Entity II,  E189,  Gold Energy,  Portugal,  Sub-Entity III,  E012,  NOS (Internet, Mobile, Fax, Landline, Cable TV), ,  Portugal,  Sub-Entity IV,  E054,  NETIM (Mailbox),  France,  Sub-Entity V,  E191,  Redes Energéticas Nacionais,  Portugal

  • OP246,  EDP and E-redes Operation of Preventing Electricity: Harm Crimes by Intentional Cutting and Preventing Electricity and Gas - Causing Suffering and Health Damage over 50 Days without Electricity and XX Days without Gas  ,  https://www.rozen-bakher.com/iccg-announcements/op246, Residence Location,  Portugal,  Main Entity,  E060,  EDP,  Portugal,  Sub-Entity I,  E190,  E-redes,  Portugal,  Sub-Entity II,  ,  ,  ,  Sub-Entity III,  ,  ,  ,  Sub-Entity IV,  ,  ,  ,  Sub-Entity V,  ,  ,  

  • OP247,  Intrum Portugal Operation-EDP Proxy Taking Money: Intrum Tried to Take Money for EDP Insurance despite that the Insurance Full EDP does not include in EDP Contract and despite that Dr. Rozen-Bakher had NEVER any Direct Contract with Intrum  ,  https://www.rozen-bakher.com/iccg-announcements/op247, Residence Location,  Portugal,  Main Entity,  E177,  Intrum Portugal,  Portugal,  Sub-Entity I,  E060,  EDP,  Portugal,  Sub-Entity II,  E054,  NETIM (Mailbox),  France,  Sub-Entity III,  E012,  NOS (Internet, Mobile, Fax, Landline, Cable TV), ,  Portugal,  Sub-Entity IV,   ,   ,   ,  Sub-Entity V,   ,   ,   

  • OP248,  E-Redes Operation as part of EDP Operation of Cutting Electricity & Gas:  On 26 September 2023, E-Redes Intentionally cut the electricity of Dr. Rozen-Bakher from the National Portuguese Electricity Infrastructure in trying to help EDP to obstruct justice - Who Instruct E-redes to Cut the Electricity without the Permission of  Dr. Rozen-Bakher ,  https://www.rozen-bakher.com/iccg-announcements/op248, Residence Location,  Portugal,  Main Entity,  E190,  E-redes,  Portugal,  Sub-Entity I,  E191,  Redes Energéticas Nacionais,  Portugal,  Sub-Entity II,  E060,  EDP,  Portugal

  • OP249,  E-redes Operation as part of EDP Operation of Cutting Electricity & Gas: From 18 - 26 September 2023, E-redes Intentionally Not Forward the Smart Meter Reading to New Provider Gold Energy, despite the Termination of the Contract with EDP, while on 26 September 2023, E-redes Intentionally Cut  the electricity of Dr. Rozen-Bakher from the National Portuguese Electricity Infrastructure ,  https://www.rozen-bakher.com/iccg-announcements/op249, Residence Location,  Portugal,  Main Entity,  E190,  E-redes,  Portugal,  Sub-Entity I,  E060,  EDP,  Portugal,  Sub-Entity II,  E189,  Gold Energy,  Portugal,  Sub-Entity III,  E012,  NOS (Internet, Mobile, Fax, Landline, Cable TV), ,  Portugal,  Sub-Entity IV,  E054,  NETIM (Mailbox),  France,  Sub-Entity V,  E191,  Redes Energéticas Nacionais,  Portugal

  • OP251,  EDP Operation of Cutting Electricity & Gas: Technicians of EDP lied regarding 3 Different Days (20.09.2023 at 10:30-13:00; 21.09.2023 at 13:00-15:30; 25.09.2023 at 10:30-13:00) that Dr. Rozen-Bakher was not at Home when they were Supposed to Come to take the Meter Reading according to EDP SMSs, while on 26 September 2023, E-redes Intentionally Cut  the electricity of Dr. Rozen-Bakher from the National Portuguese Electricity Infrastructure,  https://www.rozen-bakher.com/iccg-announcements/op251, Residence Location,  Portugal,  Main Entity,  E060,  EDP,  Portugal,  Sub-Entity I,  E193,  Technicians of EDP, 20.09.2023 at 10:30-13:00,  Portugal,  Sub-Entity II,  E194,  Technicians of EDP, 21.09.2023 at 13:00-15:30,  Portugal,  Sub-Entity III,  E195,  Technicians of EDP, 25.09.2023 at 10:30-13:00,  Portugal,  Sub-Entity IV,  E012,  NOS (Internet, Mobile, Fax, Landline, Cable TV), ,  Portugal 

  • OP262,  Gold Energy Gas Operation: Intentionally Delay in Providing Gas despite the New Gas Contract with Gold Energy (NC0237722/2023, 30.10.2023) - XX Days for Getting Gas from Gold energy, while total of- XX Days without Gas due to EDP-Gold Energy Gas Operation , https://www.rozen-bakher.com/iccg/op262, Residence Location, Portugal,  Main Entity, E189,  Gold Energy,  Portugal,  Sub-Entity I, E207,  Gas Inspector of Gold Energy,  Portugal,  ,  ,  ,  ,  ,  ,  ,  ,  Sub-Entity IV,  ,  ,  ,  ,  ,  ,  ,  

  • OP263,  Gold Energy Gas Operation: Harm Crimes via Intentional Delay in Getting Gas - Causing Suffering and Health Damage due to Living without Gas for over XX Days until Getting the Gas based on New Contract , https://www.rozen-bakher.com/iccg/op263, Residence Location, Portugal,  Main Entity, E189,  Gold Energy,  Portugal,  Sub-Entity I, E207,  Gas Inspector of Gold Energy,  Portugal,  ,  ,  ,  ,  ,  ,  ,  ,  ,  ,  ,  ,  ,  ,  ,  ,  

  • OP264,  E-redes Operation: On 30 October 2023, after 50 Days without Electricity, E-redes suddenly Connected Back the Electricity of Dr. Rozen-Bakher to the National Portuguese Electricity Infrastructure - No Explanations were given by E-redes Why they Cut the Electricity on 26.09.2023 and why they Connected it Back on 30.10.2023, https://www.rozen-bakher.com/iccg/op264, Residence Location, Portugal,  Main Entity,  E190,  E-redes,  Portugal,  Sub-Entity I,  E191,  Redes Energéticas Nacionais,  Portugal,  Sub-Entity II,  E054,  NETIM (Mailbox),  France,  Sub-Entity III,  E012,  NOS (Internet, Mobile, Fax, Landline, Cable TV), ,  Portugal,  ,  ,  ,  ,  ,  ,  ,  ,  

  1. Number of Complaint, Title of Complaint, Link of Complaint, Complaint-Number of Entity, Complaint-Name of Entity, Complaint-Country of Entity, Delivery-Entity I, Delivery-Number of Entity, Delivery-Name of Entity, Delivery-Country of Entity, Delivery-Entity II, Delivery-Number of Entity, Delivery-Name of Entity, Delivery-Country of Entity, Delivery-Entity III, Delivery-Number of Entity, Delivery-Name of Entity, Delivery-Country of Entity

    • CM033, Complaint to the CEO of EDP about EDP Operation, https://www.rozen-bakher.com/iccg-announcements/cm033, E060, EDP, Portugal,  Delivery Entity I, E054, NETIM (Mailbox), France,  Delivery Entity II, E012, NOS (Internet, Mobile, Fax, Landline, Cable TV), , Portugal,  

    • CM067, Complaint in Red Book against EDP about EDP Operation, https://www.rozen-bakher.com/iccg-announcements/cm067, E060, EDP, Portugal,  Delivery Entity I, E054, NETIM (Mailbox), France,  Delivery Entity II, E012, NOS (Internet, Mobile, Fax, Landline, Cable TV), , Portugal,  

    • CM016, Appeal to ERSE against EDP Following the Complaint on Red Book, https://www.rozen-bakher.com/iccg-announcements/cm016, E061, ERSE Entidade Reguladora dos Serviços Energéticos, Portugal,  Delivery Entity I, E054, NETIM (Mailbox), France,  Delivery Entity II, E012, NOS (Internet, Mobile, Fax, Landline, Cable TV), , Portugal


Dr. Ziva Rozen-Bakher can be reached via her contact details:

Contact Details and Home-Office Opening Time: https://www.rozen-bakher.com/contact-form


Dr. Ziva Rozen-Bakher and her son Daniel Bakher are Political Prisoners in Portugal

https://www.rozen-bakher.com/iccg-documentation/



Dr. Ziva Rozen-Bakher

Dr. Ziva Rozen-Bakher - A Researcher in International Relations with a Focus on Security, Political and Economic Risks for Foreign Direct Investment (FDI) and International Trade

https://www.rozen-bakher.com/
Previous
Previous

OP244, Duolingo Operation: Blocking Access to Duolingo in Library in Lisbon during EDP Inquvistion Period (Cutting Electricity and Gas) to Prevent Studying the Portuguese Language

Next
Next

OP241, Suspected Manipulation with Delivery of Package to the President of European Court of Human Rights (ECHR) via FedEx: Copy Complaint II-PT Police